20
ROLL CENTER
CAMBER
ROLL CENTER
357256
SHIM 6x13x1
L=R
PIVOT BALLS MUST MOVE FREELY
During initial assembly, tighten each
composite hex nut until the pivot ball
starts to bind, then loosen slightly.
Verify that the pivot balls move freely.
Tighten composite hex nuts
using HUDY tool #107581
2.5mm
353380
SHIM 4x7.5x1
353381
SHIM 4x7.5x2
DETAIL
2.5mm
2.5mm
DETAIL
DETAIL
6. FRONT SUSPENSION
Apply WD40 to
protect against rust
Apply WD40 to
protect against rust
HUDY Tool Allen 2.5mm
30mm
1mm
L=R
L=R
L=R
L=R
2x
2x
2x
2x
2.5mm
SHORT L
ONG
HUDY Tool Allen Ball 2.5mm
Marked (L) = Marked (L)
106mm
106mm
Marked (R) = Marked (R)
DETAIL
INITIAL SETTING
L=R
#357253
BRASS ADJUSTING NUT M15x1
#357251 ALU PIVOT BALL
13.7MM WITH STEEL SCREW (2)
Optional shims can be used for Roll
Center adjustment.
#353380 - Alu shim 4x7.5x1mm
#353381 - Alu shim 4x7.5x2mm
Summary of Contents for GTX8
Page 1: ......