4
www.XSscuba.com
XS Scuba Inspire Regulator Service Manual
Pre-Test and Inspection Prior to Disassembly
It is good practice to inspect the regulator prior to disassembly and to document your findings. You can
use the following checklist for items to document.
1. Characterize the overall condition of the regulator. Is it “like new” or is it scratched, nicked or heavily
corroded?
2. Pull back the hose protectors and observe the condition of the hoses where they exit the crimped
ferrules. If the rubber or braid is pulling out of the crimps or if the rubber is bulbous or swollen, document
and plan on replacing them.
3.
Observe the condition of the filter.
4. Attach a MP gauge and record the medium or interstage pressure. Record the value and whether it
stabilizes or creeps?
5. Pressurize the regulator and submerge in a tub of water. Are there any leaks? If so, document where the
leaks are coming from.
6.
Purge the regulator. Is the purge strong or weak? Is there free flow or leaking after purging?
7. If an adjustment knob or venturi deflector lever is present, check if they move freely.
8. Attach to magnehelic or conduct a subjective breathing evaluation to evaluate the opening effort.
Document your findings.
Required Tool List
Part #
Description
Application
n/a
Bench Vise
Secure regulator
TL122
Regulator Support Handle
Used to mount regulator in
bench vise
TL110
5/32”, 3/16” and 1/4”, 6mm
OR TL110 Scuba Multi-Tool
Removal / installation of
parts. Making adjustments
TL111
O-ring pick set
Removing o-rings
n/a
9/16”, 17mm , 11/16” and
13/16” wrench
Removal / installation
of parts