6
16
Start to thread one M5 bolt up from the bottom of the
KickBack mounting plate. Thread it far enough to keep the
KickBack attached to the frame. Do not fully tighten.
17
With the KickBack legs folded up, place both Xtracycle
U-bolts over the Xtracycle’s front bridge and through the
KickBack mounting plate. For the right side U-bolt and rear
threads of the left side U-bolt, thread on a washer and a nut.
For the front threads of the left side U-tube, an additional a
rectangular cutout is needed. Place the rectangular washer
over the U-bolt threads, then lightly thread on a washer and
nut.leg, then lightly thread on a washer and nut.
18
Moving the legs as necessary to allow for access to the
bolts, lightly snug all four nuts with a 10mm socket wrench.
Alternating between nuts can keep the KickBack from pulling
to one side or the other.
19
Put the legs into the down position and pull them towards
the front of the bike to ensure that the KickBack is rotated as
far forward as possible and centered on the boom tube.
Summary of Contents for Stoker 2021
Page 1: ...stoker assembly Manual 2021 ...
Page 13: ......