11
36
Use the provided Shimano lead-connector tool from the
small parts box to insert the display cable into the small port
under the display. You should feel a securing click when the
connection is made.
37
Replace your battery by sliding it into the cradle and rotating
towards the bike frame until it clicks into place.
39
Determine if you would like to have the U-tubes installed in
the wide setting (shown on the left side of the bike pictured
below) or the narrow setting (shown on the right side). In the
wide setting, the U-tubes will extend 6" out from the frame. In
the narrow setting, they will extend 5.25" out from the frame.
38 - Install the U-Tubes
Before installing the U-Tubes, please note that the rear
insertion end on each U-Tube is slightly longer than the
insertion end on the front end of the U-Tube.
Front
insertion
end
Rear
insertion
end
Narrow
Wide
Summary of Contents for STOKER
Page 1: ...stoker assembly Manual ...
Page 15: ......