50
3. Follow the instruction to finish the upgrade procedure.
4. Unplug and then plug power jack to restart this machine.
5. Repeat procedure and select
FPGA Upgrade
to upgrade FPGA
6.2 Built-in Battery
6.2.1 Replacement of Battery
There are two built-in NI-MH batteries for the operation of NuBAR-1000
Please pay attention to the notice below.
They are charged by USB cable via PC or external adapter in the NuBAR-1000 package.
They are advised to be replaced by authorized Xtramus technicians once operation time is short
obviously. Please contact with distributor for the replacement of battery. Remove the warranty label
and replace battery by yourself will lose warranty.
6.2.2 Charge and Operation Time of Battery
Fully charge is required for a chargeable fresh new battery that is pre-installed in the NuBAR-1000. The
charge and operation time is illustrated below
Battery charge time
Charge Device
Charge Time
Attached external
adapter
420 minutes if power is exhausted
1000 Mbps Gigabit Ethernet mode
Utilization
Operation Time of Fresh Battery
100%
100 minutes
10%
110 minutes
100 Mbps Fast Ethernet mode
Utilization
Operation Time of Fresh Battery
100%
200 minutes
10%
220 minutes
10 Mbps Ethernet mode
Utilization
Operation Time of Fresh Battery
100%
180 minutes
10%
205 minutes