background image

 

 

 

 

 

 

Standalone Switch/Router Tester 

User

’s Manual 

(NuStreams-P5G/NuStreamsP9A)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

USM Ver 1.2

 

Summary of Contents for NuStreams-P5G

Page 1: ...Standalone Switch Router Tester User s Manual NuStreams P5G NuStreamsP9A USM Ver 1 2 ...

Page 2: ...ccurate and reliable However Xtramus Technologies assumes no responsibility or liability for any errors or inaccuracies that may appear in the document Trademarks NuStreams P5G NuStreams P9A NuSet MiniPG NuSet MiniPG Config and NuSet MiniPG UG are trademarks or registered trademarks of Xtramus Technologies All other trademarks and registered trademarks are the property of their respective owners W...

Page 3: ... 1 0 First draft version 2011 04 25 Ver 1 1 1 Page 38 45 add notes so the readers can understand that this manual is for NuSet MiniPG Config UG only 2 Page 39 add a note regarding to warning messages 2011 07 12 Ver 1 2 Ver 1 0b019 1 Change USM template 2 Page 3 changing Revision History format 3 Page 8 replacing UTP Port with RJ45 Port ...

Page 4: ...ation for Switch Test 18 3 2 3 Installation for Residential Gateway Broadband Router Switch Test 19 4 Making Settings with Front Panel Buttons LCD 20 4 1 NuStreams P5G Front Panel Buttons LCD 20 4 1 1 NuStreams P5G Buttons Overview 20 4 1 2 NuStreams P5G LCD Overview 21 4 1 3 NuStreams P5G Front Panel Functions Basic Controls 22 4 1 4 NuStreams P5G Front Panel Functions Test Setting 24 4 1 5 NuStr...

Page 5: ...etting Switch 56 5 3 5 3 NuSet MiniPG Config Task Setting Router Switch 57 5 4 NuSet MiniPG UG Functions 59 5 4 1 NuSet MiniPG UG Functions Overview 59 5 4 2 NuSet MiniPG UG Function Menu Bar 60 5 4 2 1 Menu Bar File 60 5 4 2 2 Menu Bar Upgrade 60 5 4 2 3 Menu Bar Languages 67 5 4 2 4 Menu Bar Help 67 5 4 3 NuSet MiniPG UG Function Quick Launch Buttons 68 5 4 3 1 Quick Launch Buttons Reconnect 68 ...

Page 6: ...ch of these test subjects under Router Switch Test Type and test a broadband router s WAN LAN performance at the same time NuStreams P5G and NuStreams P9A support bi direction LAN WAN test packets with 253 IP addresses Each IP has its own settings and transmitting receiving counters including independent statistics and calculations for latency and Serial Number Also both DUT and NuStreams P5G s IP...

Page 7: ... readers NuStreams P5G and NuStreams P9A s hardware information such as fan speed and system temperature is available and can be checked LCD screen for displaying test results and related statistics 1 3 NuPAD Overview Built to be light and easy to handle NuStreams P5G and NuStreams P9A are both designed to meet the needs of production lines However considering the buttons on NuStreams P5G P9A migh...

Page 8: ... RJ45 Management Port for connecting NuStreams P5G and PC E WAN Port 10 100 1000 Mbps Ethernet RJ45 WAN Port 1 F Switch Port 1 4 10 100 1000 Mbps Ethernet RJ45 Switch LAN Ports 4 The WAN Port serves as Switch Port 5 when performing Network Switch Test 2 1 2 NuStreams P9A Interface Ports Ports Description A Console Port 38400 bps RJ45 Console Port for connecting NuStreams P9A and NuPAD B Mini USB P...

Page 9: ...EDs B System Status Power SYS USB C Test Status Pause Current running test paused Run 1 2 3 Test Task of Run 1 2 3 is running D WAN Type Static IP DHCP PPPoE E Test Status Pass DUT Test Pass Fail DUT Test Fail F Router LAN WAN NuStreams P5G is set to test Broadband Router G Test Step Status Test starts from Step 1 to Step 4 1 Link Status Test 3 Test Starts 2 Auto Negotiation Connection Test 4 Test...

Page 10: ... Mbps connection linked Static IP Using static IP as router WAN connection DHCP Using DHCP as router WAN connection D Test Pass DUT passes the test Fail DUT does not pass the test E Hotkey Pause Pause current running test Run 2 Test Task of Run 2 is running Run 1 Test Task of Run 1 is running Run 3 Test Task of Run 3 is running F LAN Link ACT NuStreams P9A s LAN ports are connected to DUT s switch...

Page 11: ...g Run 2 Green ON All Tasks stored in Run 2 are running Run 3 Green ON All Tasks stored in Run 3 are running D WAN Type Static IP Green ON DUT WAN connection is set to Static IP DHCP Green ON DUT WAN connection is set to DHCP PPPoE Green ON DUT WAN connection is set to PPPoE E Test Status Pass Green ON DUT test passed Fail Red ON DUT test failed F Router LAN WAN Green ON NuStreams P5G is set to tes...

Page 12: ...ble WAN 10M 100M Green On NuStreams P9A s connection with DUT is active Link ACT Green On WAN connection established and standing by Green Blinking Test packets sending via WAN ports Static IP Blue On DUT WAN connection is set to Static IP DHCP Amber On DUT WAN connection is set to DHCP PPPoE Green On DUT WAN connection is set to PPPoE Pass Green On DUT test passed Fail Red On DUT test failed LAN ...

Page 13: ...to the previous Menu Move the select cursor up Move the select cursor down Execute the selected selection K Operation Buttons Pause Pause the current running test Run1 Start all Tasks set in Run 1 Up to 4 Tasks can be configured in Run 1 hotkey Press this button to test ALL TASKS AT ONCE Run2 2nd hotkey that works as Run 1 Run3 3rd hotkey that works as Run 1 Menu will be displayed on the LCD scree...

Page 14: ...P5G or NuStreams P9A differently Please see the installation structure mentioned in this chapter for more detail information 3 1 Hardware Installation for NuStreams P5G 3 1 1 Installation for Residential Gateway Broadband Router Test While performing tests on Residential Gateway Broadband Router both WAN and LAN ports of the DUT must be connected to NuStreams P5G with CAT 5 UTP cables as shown in ...

Page 15: ...rforming tests on Switch DUT LAN ports must be connected to NuStreams P5G with CAT 5 UTP cables as shown in the figure down below If both NuStreams P5G s Switch Port 1 5 and DUT s ports are connected via CAT 5 UTP cables correctly the Link ACT LEDs located on NuStreams P5G s LAN Port Status LED will be ON accordingly ...

Page 16: ...hen performing tests on Residential Gateway Residential Router as shown in the figure down below Test options for Residential Gateway Residential Router Switch and Residential Gateway Residential Router are very similar with minor differences listed in the table down below DUT Type Residential Gateway Switch Residential Gateway LAN Port Select Flow Control If NuStreams P5G s WAN LAN Ports and DUT ...

Page 17: ...ateway Broadband Router Test While performing tests on Residential Gateway Residential Router both WAN and LAN ports of the DUT must be connected to NuStreams P9A with CAT 5 UTP cables as shown in the figure down below If both NuStreams P9A and the DUT are connected with CAT 5 UTP cables correctly NuStreams P9A s LAN and WAN LEDs will be ON accordingly ...

Page 18: ...ation for Switch Test While performing tests on Switch DUT LAN ports must be connected to NuStreams P9A with CAT 5 UTP cables as shown in the figure down below If both NuStreams P9A and the DUT are connected with CAT 5 UTP cables correctly NuStreams P9A s LAN LEDs will be ON accordingly ...

Page 19: ...nstallation structure when performing tests on Residential Gateway Residential Router as shown in the figure down below Test options for Residential Gateway Residential Router Switch and Residential Gateway Residential Router are very similar with minor differences listed in the table down below DUT Type Residential Gateway Switch Residential Gateway LAN Port Select Flow Control If both NuStreams ...

Page 20: ... information 4 1 NuStreams P5G Front Panel Buttons LCD 4 1 1 NuStreams P5G Buttons Overview With NuStreams P5G s control buttons located on its front panel all test parameters and system configurations can be set via these buttons Buttons Descriptions J Configuration Buttons Enter the Main Menu or return to the previous Menu Move the select cursor up Move the select cursor down Execute the selecte...

Page 21: ...plete Clear Log Delete all logs stored in NuStreams P5G Store Log Test reports will be stored automatically if this function is enable Full Warning System will issue warnings when log storage memory is running out System Setting Buzzer If enabled system will buzz whenever a button is pressed Password You can set new password for the system under this menu Date Time System date and time can be conf...

Page 22: ...trols Basic Setting Controls Function Control Button Action LCD Display Entering Main Menu Press button to enter NuStreams P5G s main menu Back to Previous Menu Press button to go back to the previous menu Moving Selection Cursor Press to move the selection cursor up or press to move the selection cursor down Entering Selected Option Press button to enter the menu option you chose ...

Page 23: ...o start all Tasks set in Run 1 press Run2 button to start all Tasks set in Run 2 and press Run3 button to start all Tasks set in Run 3 All Tasks set in the Run will be performed at the same time after pressing Run1 Run2 or Run3 button Pause Press Pause button to pause the current running test Press Pause button to resume Stop All Running Tests Exit Press button to stop all running tests and exit ...

Page 24: ...se insert from Run List menu and press button A new task with default parameters will be added to that Run To remove an existing task of the current Run choose delete from Run List menu and press button The existing task you chose will be deleted Each Run can contain up to 4 Tasks while each Task is an independent test that can contain different test parameters Load Default You can reset all setti...

Page 25: ...nfiguring parameters for the Task you ve chosen Press or buttons to choose which parameter you would like to configure and press button to start configuring Change parameter values with or buttons and press button to apply the changes Press button again to save the settings you ve made to the Task and go back to Run List menu NuStreams P5G supports 3 test modes Router Switch and Router Switch For ...

Page 26: ...Streams P5G Press to confirm or to cancel Log Auto Save Choose Store Log from Test Log menu list and press button The select cursor will be changed to icon Using or buttons to set Log Auto Save function On or Off and press button to apply the changes System will save all test logs automatically if this function is ON Warning when Memory Full Choose Full Warning from Test Log menu list and press bu...

Page 27: ...pply the changes System will make a buzz sound whenever you press a button if this function is ON Password On Off Choose Password from System Setting menu list and press button You can set the Password function On Off by selecting Password On Off Using or buttons to set Password function On or Off Setting New Password Choose Password from System Setting menu list and press button You can change sy...

Page 28: ...ress button System will ask if you really want to set all system settings to default Press to confirm or to cancel 4 1 7 NuStreams P5G Front Panel Functions System Information Function Control Button Action LCD Display Entering System Information Move the cursor to System Information and press button View System Information You can browser NuStreams P5G s system information by pressing or buttons ...

Page 29: ...brief descriptions for NuStreams P9A s control buttons Buttons Descriptions J Configuration Buttons Enter the Main Menu or return to the previous Menu Move the select cursor up Move the select cursor down Execute the selected selection K Operation Buttons Pause Pause the current running test Run1 Start all Tasks set in Run 1 Up to 4 Tasks can be configured in Run 1 hotkey Press this button to test...

Page 30: ... tests are complete Delete Log Delete all logs stored in NuStreams P9A Store Log Test reports will be stored automatically if this function is enable Full Warning System will issue warnings when log storage memory is running out System Setting Buzzer If enabled system will buzz whenever a button is pressed Password You can set new password for the system under this menu Date Time System date and t...

Page 31: ... controls Basic Functions Function Control Button Action LCD Display Entering Main Menu Press button to enter NuStreams P9A s main menu Back to Previous Menu Press button to go back to the previous menu Moving Selection Cursor Press to move the selection cursor up or press to move the selection cursor down Entering Selected Option Press button to enter the menu option you chose ...

Page 32: ...o start all Tasks set in Run 1 press Run2 button to start all Tasks set in Run 2 and press Run3 button to start all Tasks set in Run 3 All Tasks set in the Run will be performed at the same time after pressing Run1 Run2 or Run3 button Pause Press Pause button to pause the current running test Press Pause button to resume Stop All Running Tests Exit Press button to stop all running tests and exit ...

Page 33: ...se insert from Run List menu and press button A new task with default parameters will be added to that Run To remove an existing task of the current Run choose delete from Run List menu and press button The existing task you chose will be deleted Each Run can contain up to 4 Tasks while each Task is an independent test that can contain different test parameters Load Default You can reset all setti...

Page 34: ...nfiguring parameters for the Task you ve chosen Press or buttons to choose which parameter you would like to configure and press button to start configuring Change parameter values with or buttons and press button to apply the changes Press button again to save the settings you ve made to the Task and go back to Run List menu NuStreams P9A supports 3 test modes Router Switch and Router Switch For ...

Page 35: ...Streams P9A Press to confirm or to cancel Log Auto Save Choose Store Log from Test Log menu list and press button The select cursor will be changed to icon Using or buttons to set Log Auto Save function On or Off and press button to apply the changes System will save all test logs automatically if this function is ON Warning when Memory Full Choose Full Warning from Test Log menu list and press bu...

Page 36: ...pply the changes System will make a buzz sound whenever you press a button if this function is ON Password On Off Choose Password from System Setting menu list and press button You can set the Password function On Off by selecting Password On Off Using or buttons to set Password function On or Off Setting New Password Choose Password from System Setting menu list and press button You can change sy...

Page 37: ...ress button System will ask if you really want to set all system settings to default Press to confirm or to cancel 4 2 7 NuStreams P9A Front Panel Functions System Information Function Control Button Action LCD Display Entering System Information Move the cursor to System Information and press button View System Information You can browser NuStreams P9A s system information by pressing or buttons ...

Page 38: ...hardware driver must be installed on PC first After installing NuSet MiniPG NuStreams P5G s or NuStreams P9A s driver will be installed automatically NuSet MiniPG contains five different utilities with different functions as listed in the table down below Utility Description NuSet MiniPG Config NuSet MiniPG ST utility designed for setting test criteria and accessing test results statistics NuSet M...

Page 39: ... installation process 2 InstallShield Wizard is starting to install NuSet MiniPG If you would like to cancel installation click Cancel 3 Click Next to continue installation Note Due to different Operating Systems or system settings warning messages might pop up when installing NuSet MiniPG or driver for your device When this occurs please choose the options on these pop up warning messages that al...

Page 40: ... and click Next to continue 5 You can input Username and Organization in the related fields Click Next to continue 6 Click the Change button to install the program to another folder or click Next button to install the program into the default destination folder and then continue next step Click Back button to go back to the previous step to modify ...

Page 41: ...CHNOLOGIES Installing NuSet MiniPG 7 NuSet MiniPG InstallShield Wizard will start installing momentarily Click Install button to start installation 8 InstallShield Wizard is installing NuSet MiniPG 9 NuSet MiniPG installation completes Click Finish button to exit ...

Page 42: ...l NuSet MiniPG you can Uninstalling NuSet MiniPG Click Start Programs Xtramus NuSet MiniPG Uninstall NuSet MiniPG Go to the Control Panel choose NuSet MiniPG from installed program list and click Remove to uninstall Please note that all of NuSet MiniPG s components will be uninstalled ...

Page 43: ...ou can connect NuStreams P9A with your PC in the same manner You can start NuSet MiniPG by Starting NuSet MiniPG Double click NuSet MiniPG icon located on your PC s desktop Click Start Programs Xtramus NuSet MiniPG NuSet MiniPG If your PC is not connected with NuStreams P5G or NuStreams P9A you can still run both NuSet MiniPG Config and NuSet Mini UG under Demo Mode Almost all functions are availa...

Page 44: ...PAD s firmware FPGA and hardware license Exit Close NuSet MiniPG Only ONE utility can run at the same time and NuSet MiniPG can only work with ONE device You have to install different utilities in order to access different test modes listed on the NuSet MiniPG Option Menu Test modes without the proper utilities installed will be displayed as gray in color and cannot be accessed from the NuSet Mini...

Page 45: ...ams P9A manage test logs and perform system maintenance B Quick Launch Buttons With a simple click of these Quick Launch Buttons you can access configuration files from your PC NuStreams P5G NuStreams P9A and managing test logs C Info Run Select List This section contains a selectable list of NuStreams P5G or NuStreams P9A s detailed system information and Test List D Main Display Window This sect...

Page 46: ...Config will load test setting samples for network products pre defined by Xtramus All these test settings are stored in Default Config Profile folder located under NuSet MiniPG Config s installation folder These test settings are named by the format of A_B_C_D_E_F which means A Name of the testing device In here B Type of the DUT Chip or Model C Name of the Manufacturer D DUT Model Name E DUT Vers...

Page 47: ...B cable between PC and NuStreams P5G must be connected at all time while getting setting tasks 5 3 2 3 Menu Bar Log Log Get Device Log Accessing test logs from NuStreams P5G or NuStreams P9A s memory and save these logs to a specific folder on your PC After retrieving test logs from NuStreams P5G or NuStreams P9A the log folder will pop up Also a message window contains detail information about sy...

Page 48: ... Clear Device Password window A Modify Password window will pop up Input NuSet MiniPG s old password under Old Password column and type in the new password under both New Password and Confirm Password columns If you forget NuSet MiniPG s password please uninstall NuSet MiniPG and re install it again NuSet MiniPG s password will be set to admin after re installation 5 3 2 5 Menu Bar Languages Langu...

Page 49: ...ssage window will pop up and the USB Connection Status will be shown as Connected 5 3 3 2 Quick Launch Buttons Load Save Load Save Load Save The Load and Save buttons allow you to load or save test settings from to your PC identical to Load Config Profile From Existing Files and Save Configuration functions available in the Menu Bar mentioned in 5 3 1 1 Menu Bar File To load test setting files sto...

Page 50: ...ection between PC and NuStreams P5G P9A must be connected at all time while getting setting tasks 5 3 3 4 Quick Launch Buttons Get Log Clear Log Log Folder Get Log Clear Log Log Folder Get Log Clear Log Get Log and Clear Log buttons allow you to obtain test logs from NuStreams P5G P9A or clear all test logs stored in NuStreams P5G P9A just like the Get Device Log and Clear Device Log on the Menu B...

Page 51: ...ation Run setting System Information To show NuStreams P5G P9A s detailed system information click System Information on the Info Run Select List A detailed System Information will display on the Main Display Window located in the right side of the Info Run Select List The System Information displayed on Main Display Window shows NuStreams P5G P9A and NuPAD s detail information and status Refresh ...

Page 52: ... be displayed under Test List All parameters in each Task can be viewed or changed by the detailed configuration window displayed on the Main Display Window By right clicking a Task on Test List you can Add Task Delete Task Apply All Copy or Paste Tasks Add Task Add a Task with default test setting values to the current Run Up to 4 Tasks can be added in one Run Delete Task Delete the current Task ...

Page 53: ...rs of that Task in Main Display Window as shown in the figure down below Before configuring test parameters in each Task please select the DUT Test Type first The test parameters listed in the Main Display Window will change according to the DUT Test Type you chose NuStreams P5G utility has 3 different test types Router Testing Broadband Router including its WAN abilities Switch Testing Switch and...

Page 54: ...as already responded Link Wait Time Out NuStreams P5G P9A will attempt to establish connection with the DUT and wait for a period of time until time out second and NuStreams P5G P9A will not attempt to establish connection anymore Connection Setting WAN Link Type Choose the WAN connection type for DUT testing Three WAN Link Types are available DHCP Static IP and PPPoE The WAN Link Type set here mu...

Page 55: ...UT test WAN to LAN Utilization The traffic flow ratio from WAN to LAN presented in percentage 1 99 Test Delay When enabled NuSet MiniPG Config will halt for the set amount of time before starting DUT test LAN to WAN Utilization The traffic flow ratio from LAN to WAN presented in percentage 1 99 Pass Fail Criteria Loss Tolerance pkts The acceptable number of lost packets in data transmitting during...

Page 56: ...il time out second and NuStreams P5G P9A will not attempt to establish connection anymore VLAN Setting VLAN Tag Add VLAN tags to all packets VLAN ID VLAN ID Test Traffic Packet Length The length of test packets from 64 1600 Bytes transmitting by NuStreams P5G P9A Test Time The duration of time for DUT test Learning Time NuStreams P5G P9A will start sending send learning packets to the DUT The DUT ...

Page 57: ...5G P9A will attempt to establish connection with the DUT and wait for a period of time until time out second and NuStreams P5G P9A will not attempt to establish connection anymore Testing LAN Ports Please connect the DUT with NuStreams P5G P9A s Switch Ports with Cat 5 cables according to the Testing LAN Ports you set here Connection Setting WAN Link Type Choose the WAN connection type for DUT tes...

Page 58: ...o WAN presented in percentage 1 99 Learning Time NuStreams P5G P9A will start sending send learning packets to the DUT The DUT will record the MAC addresses of these packets and learn the routing to NuStreams P5G P9A Switch Utilization The traffic flow ratio of the network presented in percentage 1 99 Flow Control When Flow Control is enabled the transmitting rate will drop if traffic overflow occ...

Page 59: ...r allows you to update NuStreams P5G NuStreams P9A NuPAD s firmware FPGA and NuSet MiniPG license B Quick Launch Buttons With a simple click of these Quick Launch Buttons you can reconnect to disconnected NuStreams P5G P9A and updating firmware FPGA and license C Info Select List This section displays NuStreams P5G P9A s information D Main Display Window This section displays detailed system infor...

Page 60: ...lowing demonstrations will show you how to upgrade NuStreams P5G s firmware Processes for upgrading NuStreams P5G s FPGA and NuStreams P9A s firmware FPGA are quite the same and can be related 1 To start upgrading NuStreams P5G s firmware click Upgrade Firmware Upgrade on NuSet MiniPG UG s Menu Bar as shown in the figure down below 2 A message window will pop up reminding you that all NuStreams P5...

Page 61: ...61 E mail sales xtramus com Website www Xtramus com XTRAMUS TECHNOLOGIES Upgrade ...

Page 62: ...lease be sure that the NuStreams P5G and your PC s power remain ON during the process 6 NuStreams P5G s LCD will display messages as shown in the figure down below during firmware upgrading 7 Firmware upgrading complete Click OK to finish 8 NuStreams P5G will reboot and its LCD will display messages as shown in the figure down below while rebooting 9 The connection between NuStreams P5G and your P...

Page 63: ...grading NuPAD s firmware with NuStreams P9A is quite similar and can be related Installation for Upgrading NuPAD 1 Connect NuPAD with NuStreams P5G s Console Port via a CAT 5 Straight through cable as shown in the figure down below 2 Connect NuStreams P5G s USB Port with your PC via a USB cable as shown in the figure down below After connecting NuPAD NuStreams P5G and your PC according the descrip...

Page 64: ...pgrade on NuSet MiniPG UG s Menu Bar as shown in the figure down below 2 Select NuPAD s firmware in the format of bin stored in your PC then click Open 3 Click Yes to start upgrading firmware 4 NuSet MiniPG UG will start the NuPAD firmware upgrading process Please note that during the upgrading process NuPAD NuStreams P5G and your PC must be power on and connected properly at all time ...

Page 65: ...g the firmware uploading process NuPAD s LCD screen will display messages as figure shown down below 7 Firmware upgrading completes Please click OK to continue 8 When the firmware completes uploading NuPAD s LCD will display messages as figure shown down below 9 NuPAD will reboot and try to re connect with NuStreams P5G after upgrading its firmware Please remove the USB cable between your PC and N...

Page 66: ...e NuStreams P5G s license Upgrading NuStreams P9A s license is quite similar and can be related 1 To start upgrading NuStreams P5G s license click Upgrade License Upgrade on NuSet MiniPG UG s Menu Bar as shown in the figure down below 2 A License Update window will pop up showing licenses for NuSet MiniPG and NuStreams P5G Please click the Load button located on the upper left part to start updati...

Page 67: ...ng your license If you have any problems with your NuStreams P5G NuSet MiniPG s licenses please contact Xtramus Technologies with the following contact information E mail sales xtramus com Tel 886 2 8227 6611 Fax 886 2 8227 6622 5 4 2 3 Menu Bar Languages Languages English Simplified Chinese NuSet MiniPG Config has 2 different languages for its UI available You can set the language of UI to either...

Page 68: ...indow will pop up and the USB Connection Status will be shown as Connected 5 4 3 2 Quick Launch Buttons Firmware Upgrade Firmware Upgrade Firmware Upgrade The Firmware Upgrade button allows you to upgrade NuStreams P5G NuStreams P9A s firmware For more detailed descriptions please refer to the Firmware FPGA Upgrade section in 5 4 2 2 Menu Bar Upgrade 5 4 3 3 Quick Launch Buttons FPGA Upgrade FPGA ...

Page 69: ...e Info Select List contains a list of selectable options When selected the Main Display Window will show NuStreams P5G P9A s system information To show NuStreams P5G P9A s detailed system information click System Information on the Info Select List A detailed System Information will display on the Main Display Window located in the right side of the Info Select List as shown in the figure down bel...

Page 70: ...treams P5G P9A s Console Port B LCD Screen Displaying system information status and test results C Control Buttons Pause Press this button to pause the current running test Press this button again to resume the test Stop Press this button to stop the current running test Run Press this button to start test D E System LEDs Sys Link Alarm Showing NuPAD running status Power When NuPAD is connected to...

Page 71: ...shing connection with NuStreams P5G P9A and its LCD will display system status as shown down below 1 NuPAD is powering up 2 Showing NuPAD s hardware and firmware version 3 NuPAD is starting connecting with NuStreams P5G P9A During this process NuPAD s buzzer will be beeping 4 Connection established and NuPAD s buzzer stops beeping If NuPAD s buzzer keeps beeping and the connection between NuStream...

Page 72: ...n Current Run Run Press Run to start all Tasks in the current Run The current Run Run 1 3 about to be tested will be displayed on the upper right part of LCD Switching Current Run Pause Stop To change the current Run Run 1 3 press both Pause and Stop buttons at the same time If NuPAD is current in Run 1 pressing both Pause and Stop buttons at the same time will switch the current Run from Run 1 to...

Page 73: ... this document are subject to change without notice All products and company names are trademarks of their respective corporations Copyright 2010 Xtramus Technologies all rights reserved Do not reproduce redistribute or repost without written permission from Xtramus Doc USM_NuStreams P5G_P9A_V1 2_ENG_Preliminary_20110622 ...

Reviews: