background image

Rail — Header Segment

 

Rail — Middle Segments x2

 

Rail — End Segment with Trolley Stop Bolt

 

Master Link Set 

(Including 1x spare set)

 

x 2

 

x 1

 

Extended Rail (39-2/5 inch) — Extended Middle Segment

 

Discard 1 Middle Segment (25-3/5 inch)

 

Extended Belt  (approx. 249-4/5 inch)

 

Kit Inventory

 

x 1

 

Components Required from Opener Inventory

 

End Segment with Trolley Stop Bolt 

Extended Middle Segment (39-2/5 inch) 

Original Middle Segment (25-3/5 inch) 

Header Segment 

WARNING 

- Discard ONLY ONE of the original MIDDLE rail segment. 
- ONLY 5 pieces of rail segment should be applied. NEVER connect extra rail segments. 
- The opener only services door to max. of 8 FT. height. Door with other size please call service before installation. 

Replace ONE of the original rail Middle Segment with the “Extended Rail Segment” in the middle of rail assembly.

 

STEP 1. To Assemble Rail with “Extended Middle Segment” 

Original Middle Segment (25-3/5 inch) 

GARAGE DOOR OPENER EXTENSION KIT

 

MODEL: 425-1600

 

WARNING 

To prevent SERIOUS INJURY or DEATH: 
- DO NOT connect power until instructed. 
- CLOSE the door before installation. 

Trolley Shaft 

 

Please refer to “Rail and Trolley Assembly” in Owner’s Manual. 

 

Trolley 

1

2301 Traffic St. NE 

Minneapolis, MN 55413

 

www.gdohelp.com 

1-877-GDO-4402 

1-877-436-4402 

Reviews: