Xtreme Power Conversion Corporation
P90 User’s Manual
Page 47
Uninterruptible Power Supply
Note:
The cable connection from the external battery connector to PCB is already present inside the battery box.
All the other cable connections should be made in accordance with the above wiring diagram.
P90-BP72
Batt Link PCBA +
Batt Link PCBA -
Breaker
1st battery bench
2nd battery bench
RED
RED
BLACK
BLACK
Picture example as below:
280M
M
240M
M
380M
M
380M
M