Xtreme Power Conversion Corporation
P90L 6kVA & 10kVA User’s Manual
Page 44
Uninterruptible Power Supply
Installation And Operation
UPS Unpacking
• Remove the unit from PE foam.
• Check Accessories
o one set of user’s manual
o one set of accessory kit
o RJ45 - molex cable
o (2) 12” NEMA L6-30P cables (6kVA only)
o (1) 12” NEMA L6-30R cable (6kVA only)
Selecting Installation Position
• It is necessary to select a proper environment to install the unit, in order to minimize the possibility of
damage to the unit and extend the life of the unit. Please follow the advice below:
• Keep at least 30 cm (12 inches) clearance from the rear panel of the unit to the wall. Do not block the air-
flow to the ventilation openings of the unit. Also check the installation site to avoid over-heat and exces
-
sive moisture.
• Do not place the unit in an environment near dust, corrosive or salty material or flammable objects.
• Do not expose the unit to outdoors.