Installation Procedures
The UPS can be used in a standalone tower format using the two supporting stands, or can be mounted
in a 19 inch rack using the mounting brackets. Proceed to the corresponding section, and then connect
internal batteries. All required items are included in the delivery, except rails – available as rail kit
option.
NOTE
The UPS output receptacles and/or terminals are live as soon as the UPS is
connected to input utility power, even if the UPS has not been switched on via the
front panel.
Tower Installation
1.
Place the UPS cabinet horizontally on a flat surface.
2.
Assemble the plastic support feet and mount them to UPS bottom (see FIG 7 or FIG 8)
3.
Place the cabinet upright and mount top covers
4.
Attach the display sticker
FIG 7 – XPRT-6KVA TOWER ASSEMBLY