2. Installation
2.1 Initial Inspection
1.
Visually examine if there is any damage inside and outside of packages in the process of the
transportation. If any damage is found, report it to the carrier immediately.
2.
Verify the product label is correct.
3.
If the equipment needs to be returned, carefully repack the equipment using the original
packing material.
2.2 Installation Environment
1.
The UPS is designed for indoor use only and should be located in a clean environment with
adequate ventilation to keep the environmental parameters within the required specification.
2.
Make sure that transportation routes (corridor, door gate, elevator, etc.) and installation area
can accommodate and bear the weight of the UPS, the external battery cabinet and handling
equipment.
3.
The UPS uses forced convection cooling by internal fans. Cooling air enters through ventilation
holes on the cabinet front door and exits through the cabinet top cooling fans. Please do not
block the ventilation holes.
4.
Ensure that the installation area is spacious for maintenance and ventilation.
5.
Keep the temperature of installation area below 40°C and humidity within 90%. If necessary,
install a system of room extractor fans to keep temperature below 40C.
6.
Air filters are necessary if the UPS operates in a dusty environment.
7.
If an external battery cabinet is used, it is recommended that the external battery cabinet is
located right next to the UPS cabinet. We recommend the following clearances:
⚫
Keep a clearance of 100cm from the top of the UPS for maintenance, wiring and
ventilation.
⚫
Keep a clearance of 150cm from the front of the UPS and the external battery cabinets for
maintenance and ventilation.
8.
For safety concerns, we suggest that you shall:
⚫
Keep CO2 or dry powder fire extinguishers near the installation area.
⚫
Install the UPS in an area where walls, floors and ceilings were constructed with fireproof
materials.
9.
Do not allow unauthorized personnel to enter the installation area. Assign specific personnel to
keep the UPS key.
Summary of Contents for X90-2S
Page 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Page 15: ...Figure 2 13 Terminal Blocks...
Page 17: ...Off There is neither a fault nor an alarm...
Page 22: ......
Page 37: ......
Page 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Page 42: ......
Page 53: ...Figure 4 6 Control screen page...
Page 55: ...Figure 4 9 System Measurement Screens...
Page 56: ...Figure 4 10 Module Measurement Screens...
Page 88: ......