2.4 Moving the Cabinet
The UPS is fixed on the pallet with 2 fixing cabinet plates. When removing them, pay attention
to the movement of the casters to avoid accidents.
The cabinet can be pushed forward or backward only. Pushing it sideward is not allowed.
When pushing the cabinet, pay attention not to overturn it as the gravity center is high.
1.
If you need to move the UPS over a long distance, please use an appropriate equipment like a
forklift. Do not use the UPS casters to move over a long distance.
2.
After the UPS has been removed from the pallet to ground, we suggest that at least three
people move the UPS to the installation area. One person holds a lateral side of the UPS with
hands; another holds the other lateral side of the UPS with hands, and the third person pushes
the UPS either from the front side or from the back side to the installation area and avoid
tipping the UPS.
3.
The casters are designed to move on level ground. Do not move the UPS on an uneven surface.
This might cause damage to the casters. Toppling the UPS could also damage the unit.
4.
Ensure that the weight of UPS is within the bearing capacity of any handling equipment.
5.
At the bottom of the UPS, the four casters help you move the UPS to a designated area. Before
you move the UPS, please turn the four leveling feet counterclockwise to raise them off the
ground. This protects the leveling feet from being damaged.
6.
To fix the cabinet in position, simply rotate leveling feet clockwise.
7.
One can re-use the 2 fixing cabinet plates to fix the cabinet firmly to the ground. Refer to Figure
2-6.
Figure 2-6
Caster
Leveling foot
Fixing cabinet
plate
Summary of Contents for X90-2S
Page 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Page 15: ...Figure 2 13 Terminal Blocks...
Page 17: ...Off There is neither a fault nor an alarm...
Page 22: ......
Page 37: ......
Page 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Page 42: ......
Page 53: ...Figure 4 6 Control screen page...
Page 55: ...Figure 4 9 System Measurement Screens...
Page 56: ...Figure 4 10 Module Measurement Screens...
Page 88: ......