MAINTENANCE
MAINTENANCE
7
1. mount the bolt (D) through the mudguard fixing bracket into the
splintage (B) and tighten it.
2.
mount the bolt (C) bottom-up through the mudguard rear hole into the
splintage (B) and tighten it.
A. Mudguard
B. Down splintage
C. Bolt M6X16
D: Bolt M6 x16
1. Fix the number board (A) into the location pillar of mudguard (E)
2. Install the bolt (C), bush (D) into the upper splintage (B) and tighten
the bolt with 10mm socket spanner.
A. Number board
B.Upper splintage
C. Bolt M6X25
D. Bush 8X1.0X15
E. Location pillar
MUDGAURD ASSEMBLY
BOARD ASSEMBLY
1. put the wheel (A) on the right position to place the disc (E) between
the brake caliper pad.
2. mount the axle (B) through the left fork, bush (D), wheel, bush (D)
and right fork in sequence, and then fix the nut (C) and tighten it.
A. Wheel
B. Wheel axle M12X160
C. Nut M12
D. Bush 16X1.2X13 2pcs
E. Brake disc
ASSEMBLY FRONT WHEEL AND REAR SHOCK ABSORBER
Summary of Contents for 99782
Page 5: ...OPERATION 4 ...
Page 6: ...OPERATION 5 ...
Page 11: ...MAINTENANCE 10 ...
Page 12: ...EXERCISE MONITOR MAINTENANCE 9 ...
Page 13: ...MAINTENANCE 10 ...
Page 14: ...EXERCISE MONITOR MAINTENANCE 11 ...
Page 15: ...MAINTENANCE 12 ...
Page 16: ...EXERCISE MONITOR TROUBLESHOOTING 13 ...
Page 17: ...OF NOTE 14 ...