Xunison Hub M50 Mesh Tower
Networking/Mesh button:
Press and hold the Mesh button
for 2-8 seconds until the blue
light starts blinking to enter into
the pairing mode(used to extend
routing).
Cable Interface:
Used to connect operator's
optical modems, gateways, user's
computers, mobile phones,
tablets, set-top boxes, etc.
Power Connector:
Used to connect to the power
supply. The power ratings are
12V 1A.
Reset Button:
Long press for more than 6
seconds and release. The
indicator light turns OFF and
the system resets and restarts.
4. Ports and Interfaces
9
Summary of Contents for M50 Mesh Tower
Page 1: ...Hub M50 Mesh Tower...