16
Version 1 – GBR (05/05/2020)
D-502-0173
6.
Commissioning
6.1.
Before the first operation, check the following:
-
All fixation elements used during transport have been removed
-
The mains cable of the unit is properly connected to the mains
6.2.
Switching on
-
Turn the main power switch at the back of the unit from the position 0 to the position I
-
Turn the main control element (knob) to approximately central position of the output scale (vertical)
-
A blue signal diode on main control panel will light up, signalling the unit is running
-
The unit will start increasing output to the set value. Unit fan start-up can take approx. 5 sec.
-
Set the arm to the supposed operating position. If necessary, the arm may be extended by 15 cm in the
flexible part to increase its reach.
-
Use adequate force when adjusting the arm to the desired position to avoid damage to the arm or tipping
the unit over.
-
After starting the unit for the first time, check the basic performance of the unit
6.3.
Setting the correct power of the unit
6.3.1.
Setting the output of the MiracleAir 300-A aerosol exhaust
-
The setting of the effective extraction power is displayed on the scale of the main control (know) by the
symbol of the suction arm; effective extraction power is marked
in dark colour.
MINIMUM RECOMMENDED
OUTPUT SETTING OF THE
EXHAUST UNIT – EFFECTIVE
EXTRACTION DISTANCE approx. 20
cm
MAXIMUM RECOMMENDED
OUTPUT SETTING OF THE
EXHAUST UNIT – EFFECTIVE
EXTRACTION DISTANCE approx. 30
cm
Fig. 15