background image

 

 

Verze 1 – GBR (25.8.2020) 

D-502-0171 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-

 

other technical parameters can be found in the catalogue sheet 
 

3.

 

Installation – installation of air curtains in the working position 

3.1.

 

General information, recommendations and safety during installation of the Wind air curtain 

3.1.1.

 

Electrical safety when installing the curtain 

-

 

Before starting any assembly works, it is necessary to switch off the power supply to the prepared 

electrical installation for subsequent activation of the unit. During installation, the switch must be 

secured against being switched on again.

 

 

 

3.1.2.

 

Modification of existing heating distribution systems  

-

 

It is appropriate to use filters for rough impurities in the heating systems to protect the water exchanger 

from possible damage from the existing distribution systems.  

 

3.1.3.

 

Load bearing capacity of the assembly site  

-

 

The selected assembly site must be suitable for the permanent load by the curtain. In case of doubt, the 

load capacity of the wall/walls must be verified by a structural engineer or other responsible person. 

 

 

3.1.4.

 

Minimum assembly distances  

-

 

The minimum intake distance (fan) of the curtain from the wall/ceiling is 0.3 m. 

 

-

 

The minimum distance between the side of the curtain and the wall is 0.1 m (assess a suitable distance 

from the side of the exchanger outlets to allow easy connection). 

 

Summary of Contents for WiIND Series

Page 1: ...1 Verze 1 GBR 25 8 2020 D 502 0171 INSTALLATION AND OPERATING MANUAL FOR THE WIND AIR CURTAIN FOR INDUSTRIAL AND COMMERCIAL USE...

Page 2: ...bearing capacity of the assembly site 8 3 1 4 Minimum assembly distances 8 3 1 5 Minimum safety distance from flammable substances 9 3 1 6 Operation environment of the curtain 9 3 1 7 Levelling of th...

Page 3: ...tallation and electrical connection 20 3 9 1 General Information Safety 20 3 9 2 Connection of power supply and curtain control 20 3 9 3 Description of power and control terminals electrical diagram o...

Page 4: ...serves to filter the air in the inner environment The curtain is intended mainly for entrances to industrial halls warehouses sports facilities workshops smaller facilities and commercial premises Th...

Page 5: ...lass IP54 and IP44 according to the selected curtain type and the motor insulation class B The fan and its board are treated with powder coating RAL 9005 2 1 2 WATER EXCHANGER Maximum permissible temp...

Page 6: ...erze 1 GBR 25 8 2020 D 502 0171 2 2 Main dimensions and requirements for the minimum working space for the WIND curtain VERTICAL INSTALLATION HORIZONTAL INSTALLATION MIN OPERATING AND INSTALLATION SPA...

Page 7: ...chnical data EC Declaration of Conformity the current and full version of the EC Declaration of Conformity can be seen on our website www xvent cz under the Wind category hot air heating product docum...

Page 8: ...2 Modification of existing heating distribution systems It is appropriate to use filters for rough impurities in the heating systems to protect the water exchanger from possible damage from the exist...

Page 9: ...iling installations The curtain must stand on a flat coherent and solid surface The correct height of the curtain must be at least 100 mm longer than the actual height of the curtained hole If the hei...

Page 10: ...r clearance of the required opening according to its dimensions The correct height of the chained assembly must be at least by 100 mm longer than the actual height of the construction opening The curt...

Page 11: ...the curtain rear part by the fan to anchor the assembly from the side Select a suitable method and connecting material for anchoring according to the situation at the place of installation 3 3 3 Maxim...

Page 12: ...stallation For the correct functionality of the curtain curtaining the opening the curtain must overlap on each side by at least 100 mm beyond the width of the curtained opening If the width of the op...

Page 13: ...into the ceiling in the wall etc Wind air curtain weight table 3 5 4 Correct installation in horizontal position To allow proper rotation of the curtain 10 towards the outside area pre exhaust setting...

Page 14: ...oring structures e g wall consoles Select suitable anchoring material and tools according to the material and the type of the background Anchoring material is not part of the delivery 3 5 7 Installati...

Page 15: ...ding to section 3 5 1 3 6 2 Determination of the installation location for the chained curtains Determine the place for the installation of the chained curtain the exhaust curtain must be flush with t...

Page 16: ...the connecting piece protrudes from the chained curtain Use 6 screws M6x20 part of the connecting part packing to install the connection piece Chained curtains must not be connected before lifting the...

Page 17: ...partially unpacked curtain according to section 3 5 1 with mounted mounting hinges using a suitable handling technique e g forklift to the prepared assembly point Partial packaging pallet protective p...

Page 18: ...ger necks This prevents the exchanger outlet from being overturned which may result in irreversible damage to the water exchanger Curtain rotation increase of pre blow at a vertical installation allow...

Page 19: ...ction If the automatic control valve is not installed to control the heating capacity we recommend to shut off the heating water supply to the exchanger when the fan is switched off Any high temperatu...

Page 20: ...e curtain is equipped with a wiring box containing spring terminals of the push in type for connecting the curtain power supply and control membrane bushings for pulling the control cable through and...

Page 21: ...ction of 1 curtain 3 9 3 2 Description of the curtain connection during the chaining Connect the curtains during the chaining according to the diagram see point 5 3 The connecting terminals allow inte...

Page 22: ...pply to the prepared electrical installation for subsequent activation of the curtain During installation the switch must be secured against being switched on again by an unauthorized person 3 9 5 Dis...

Page 23: ...23 Verze 1 GBR 25 8 2020 D 502 0171 4 2 Control elements...

Page 24: ...D 502 0171 5 Atacama heating unit wiring diagram 5 1 Details of connecting the main terminal box to the regulator ELEMENTAIR E M1 and with the accessories 5 2 Connection of the Wind curtain with the r...

Page 25: ...25 Verze 1 GBR 25 8 2020 D 502 0171 5 3 Connection of chained Wind curtains with regulator ELEMENTAIR E M1...

Page 26: ...s cooled down Otherwise there is a risk of burns and injuries caused by rotating parts 7 1 Regular maintenance Regular check of the curtain especially the water exchanger is recommended to perform eve...

Page 27: ...r the exchanger has cooled down Any electrical service work must be carried out by a person with professional qualifications Complete the electrical connection precisely according to the supplied elec...

Page 28: ...sed or not operable products and packaging should be returned to the appropriate recycling locations where they will dispose of them in a professional manner Please dispose the unusable parts of the p...

Page 29: ...natural disaster When applying the warranty it is necessary to submit a report part of this document containing details of the complaining person company date and number of the sales document detail...

Reviews: