Fig. 10
3.1.5.
Installation Positions of the Xhouse unit
-
All the Xhouse unit types can be installed in the following position:
-
Any other position is prohibited
3.2.
Xhouse Unit Installation
-
The unit must be operated in enclosed and dry areas with room temperature ranging b5 °C and
+30 °C.
-
The recovery unit must be installed in accordance with the general and local safety regulations.
-
The recovery unit may be installed, connected, commissioned, and repaired by a person with adequate
education, experience, and knowledge of applicable regulations, standards, and potential risks and
hazards, or by a properly trained service technician.
-
Failure to follow the installation procedure may result in the unit's damage or malfunction, or potential
harm to the health and property of the user.
-
Take special care when installing the condensate drain via a condensation sump (not a part of the
supply) into the sewerage piping. The unit manufacturer accepts no liability for damage caused by
incorrect installation of the condensate sump, drain piping, and other peripherals required for their
operation.
3.2.1.
Mounting equipment required to install the Xhouse unit - general requirements
-
Prepare mounting aids (not included) to install the unit:
o
Anchoring elements (e.g. dowels, dowel screws)
2 pcs
-
Select the anchoring material according to the wall construction, unit weight, and the weight of the
connected peripherals.
-
The unit variant weights are given in item 2.1. “Basic technical parameters”
-
The unit dimensions are given in item 1.8. “Main dimensions of the Xhouse unit”