5.11 Decommissioning
5.11.1 General notes
Decommission the Alyza IQ
prior to carrying out one of the following activities:
Dismounting the measuring unit
(e.g. for complex maintenance activities in the measuring unit)
Transporting the Alyza IQ
Read the chapter 2 Safety instructions,
22 before doing any maintenance
work. This is important for your personal safety.
NOTE
The interior of the measuring unit is temperature-controlled to 25 °C (68 °F).
With ambient temperatures over 25 °C (77 °F)
,
condensation water may devel-
op on the cool surfaces and cause damage when the measuring unit is opened.
To avoid damage of the measuring unit due to the formation of condensation
water, always wait for the temperature adjustment (function Öffnen der Messein-
heit vorbereiten) to be completed before opening the measuring unit.
6
Mount the measuring unit to the cooling unit (with the fixation of the
measuring unit).
7
Re-insert the waste tube into the collection funnel.
8
Screw the sample tubes of the measuring units to the overflow vessels.
The sample tube for overflow vessel 2 is labeled red.
9
Re-plug the 4 data cables of the measuring unit to the ACM.
10
Re-plug the 2 power supply cables to the switch box.
11
Reinsert the cover in front of the ACM and fix it with the 2 screws..