Alyza IQ PO4
Commissioning
57
ba76201d03
05/2020
Connecting the
cable with the
power supply box
NOTE
No other consumers, with the exception of those described in this operating
manual, may be connected to the power supply box.
Line branches in the supply lines are not permitted.
17
To guide the sample return into the basin and dispose of the chemicals
waste separately:
Run the return line for sample through the front big cable gland at the
housing bottom.
– The sleeve tube should end flush with the tube inside the housing so
that a collection funnel can be installed.
– Fix the sleeve tube with the cable gland.
– Position a suitable collecting container for the chemical waste under
the Alyza IQ and secure it.
Empty the collecting container regularly.
– Put the return line for the chemical waste into the collecting container
and secure it.
– The chemical waste in the return line must be able to flow freely
(steady slope). The end of the return line must not be immersed in
water or the liquid chemicals collected.
figure 3-24Connections at the housing bottom (from below)
Example: 2 sample channels, 1 drain
1
IQ S
ENSOR
N
ET
cable
2
Power line
3
Variants with 2 sample channels:
Gland for sleeve tube of intake line (channel 2)
4
Gland for sleeve tube of intake line (channel 1)
5
Gland for sleeve tube of return line 1
6
Gland for sleeve tube of return line 2
(in the example it is unused and sealed with a yellow protective plug)
Unused cable glands of the basic instrument have to be closed with
the yellow protective plugs supplied.
1
3
6
2
5
4
Summary of Contents for Alyza IQ PO4-XYZ
Page 171: ......