5.3 Start the pump
Follow the instructions in the Installation, Operation, and Maintenance manual for the pump
and the control panel.
1. Open the shutoff valve.
2. Switch on the main power supply.
3. Check that the unit is emptied from water:
a) Fill the tank with water up to the start level.
b) Check that the pump stops within 4 minutes.
c) Repeat five times to make sure that the level sensors are working properly.
4. Check that the pump and pipe assembly are fixed and watertight.
5. Pull the high-level alarm level sensor, hold it in a horizontal position and verify that the
pump starts.
The alarm is activated if everything is right.
6. Always close and lock the access cover before leaving the unit.
5 Operation
Flygt Top Installation, Operation, and Maintenance Manual
21