Manual Ozone Generating System SMOevo
Error! Use the Home tab to apply Überschrift 1 to
the text that you want to appear here.
Rev. 1.0
Page 78 of 91
During
maintenance work
Use slip-resistant climbing aids or working platforms when
carrying out work above head-height.
Never climb up on system components!
Wear safety harnesses when performing maintenance work
at heights!
Replace the specified wear and safety parts in the event of
damage.
If the system must be started during maintenance work (test
run), the responsible personnel must ensure that no persons
or objects are within the hazardous area.
After maintenance
work
Check all loosened screw connections for tightness and
retighten, if necessary.
Check all gas lines for leakages.
Check all protective equipment.
Carry out a test run of the ozone system.