Manual Ozone Generating System SMOevo
Error! Use the Home tab to apply Überschrift 1 to
the text that you want to appear here.
Rev. 1.0
Page 80 of 91
P&I No.
Component
What to do
Interval
CV310
03.0.25
Check valve
Visual inspection
every 6 months
SV310-2
03.0.05
Solenoid valve
Visual inspection
every 6 months
Piping
Visual
inspection
weekly
Assembly: Cooling system
CV310-1
07.0.10
Actuated
butterfly valve
Visual inspection
monthly
PI310-2
07.0.20
Pressure
gauge
Visual inspection
weekly
FT/FSL310
07.0.15
Flow meter
Visual inspection
every 6 months
TT310-2
07.0.40
Temperature
sensor
Visual inspection
every 6 months
PI310-3
07.0.45
Pressure
gauge
Visual inspection
weekly
CV310-2
07.0.65
Actuated
butterfly valve
Visual inspection
monthly
FSL310
07.0.75
Flow meter
Visual inspection
monthly
CV310-2
07.0.80
Actuated ball
valve
Visual inspection
monthly
Piping
Visual
inspection
weekly
Assembly: Electrical Components / Electrical Cabinet
Fan
Visual
inspection
weekly
Filter mat
Filter mat cleaning,
replacing filter mats,
if necessary
at least
every 6 months
1)
Electrical
components
Checking all
connections
for tightness.
annually
Assembly: Safety equipment
Warning
signs,
pictographs
Visual inspection
weekly
1) dependent on ambient conditions
2) if indicated in the controller unit of the ambient air monitoring.