Alyza IQ PO4
150
ba76201d03
05/2020
Preparing the
basic instrument
for transport or
storage
Preparing the
ChemBags for
transport or
storage
figure 5-25Transportation safety devices
1 Control unit with connectors
2 Transport protector 1 in the front
3 Transport protector 2 in the front
4 Transport protector 3 in the background
5 Measuring unit
3
4
5
2
1
8
Close the doors of the Alyza IQ and secure the doors against inadver-
tent opening.
9
Switch the power line potential free.
10
Uninstall the power line from the separator.
11
Remove the terminal holder if necessary.
12
Secure the housing of the Alyza IQ against being damaged (e.g. by
shock, overturning, falling, sliding, etc.).
13
Check the condition of the Alyza IQ with the checklist for transport and
storage.
14
For transport, pack the ChemBags leakproof and protected against any
mechanical stress (e.g. shock, folding) and thermal impact (e.g. tem-
peratures too high or too low).
Summary of Contents for WTW Alyza IQ PO4
Page 171: ......