Commissioning
Alyza IQ PO4
66
ba76201d03
05/2020
3.3.17 Connecting the tubes and liquid lines
After connecting the intake lines to the housing, connect the following tubes and
liquid lines:
the blue intake lines to the filtration pumps
the sample feed tubes of the pumps to the overflow vessels
the transparent sample overflow tubes of the overflow vessels to the collec-
tion funnel for the sample overflow
the transparent sample tubes of the measuring unit to the overflow vessels
the black waste tube of the measuring unit to the collection funnel for chem-
ical waste or to the collection funnel for the sample overflow.
67 shows the housing with the completely connected lines includ-
ing the accessories and all options:
4
Insert the slide of the filter module in the rail and lower it into the basin
with the aid of the chain. Fix the end of the chain outside the basin.
5
Run the intake line to the Alyza IQ. Fix the sleeve tube with cable ties
at some suitable places as necessary. How to connect the intake line to
the Alyza IQ, (see section 3.3.17 Connecting the tubes and liquid lines,
66).
For all work done with the housing open:
If the Alyza IQ was already in operation:
Before opening the doors, start the maintenance routine at the
terminal.
Note the environmental conditions (see Abb. 3.3.1,
27).
Open the outer housing door far enough so the arrestable brake-
stay catches.
Open the inner housing door far enough so that it touches the
outer door. Tilt the angular sheet (at the inside of the outer door)
over the upper edge of the inside door.