Commissioning
Alyza IQ PO4
76
ba76201d03
05/2020
3.4.4 Preparing the Alyza IQ for measuring
After completing the install wizard, carry out some further steps at the terminal
of the IQ S
ENSOR
N
ET
.
9
Re-insert the front cover of the measuring unit.
10
Close the housing of the Alyza IQ.
11
Prepare the Alyza IQ for measuring (see section 3.4.4 Preparing the
Alyza IQ for measuring,
1
Open the Alyza menu / tab
Wartung
/
Wartung Messeinheit
.
2
Carry out the function
Messung vorbereiten
(Alyza menu / tab
Wartung
/
Wartung Messeinheit
/
Messung vorbere-
iten
).
3
Switch to the menu
Wartung
/
Manuelle Funktionen
.
figure 3-34Tab Wartung / Manuelle Funktionen
4
Carry out the function
System befüllen
.
(Alyza menu / tab
Wartung
/
Manuelle Funktionen
/
System befüllen
)
The tubes and MultiPort valve (MPV) are filled.
When the function has been successfully completed, the message
Sys-
tem erfolgreich befüllt.
is displayed.
5
Quit the menu
Manuelle Funktionen
with
<ESC>
.