Alyza IQ PO4
Measurement / Operation
93
ba76201d03
05/2020
More details on the lifetime of a replacement part can be opened with
<OK>
.
4.5.3 Information on maintenance activities and calibration procedures
(tab
Historie
)
The Alyza IQ histories provide an overview of the replacement parts installed,
the maintenance activities carried out, and the calibration procedures per-
formed.
Installierte Wartungsteile
(list of the replacement parts installed with installation date and the expiry
date entered)
Kalibrierhistorie
(list of the last calibration procedures with the relevant calibration data)
figure 4-8 Information on Laufzeiten, detailed view (Tab Laufzeiten)
Summary of Contents for WTW Alyza IQ PO4
Page 171: ......