Installation
DW/P
14
ba77278e01
01/2024
3
Installation
3.1
Scope of delivery
DW/P drinking water panel with mounted components
– Inlet section
- Pipes and glands
- Pressure reducer
- Sampling valve
- Flow indicator
– Turbidimeter, depending on the configuration
– MIQ/IDS2 or MIQ/IDS4, depending on the configuration
– Guide rail for mounting the flow through armatures
– Flow through armatures, depending on the configuration
– Maintenance console MTC/C
– Outlet section
– 8 spacers (20 mm) for wall mounting
Components not mounted
– Assembly wrench FS DWP
– Cleaning brush
Operating manuals
– Drinking water panel
– Components mounted
3.2
Basic principles of installation
3.2.1 General installation instructions
Pay attention to the following points during installation:
The drinking water panel is shipped in protective transport packaging.
We recommend: Keep the packaging material (e.g. for a return shipment).
The original packaging protects the drinking water panel from transport dam
-
age.
Due to its weight, the drinking water panel must always be carried by two peo
-
ple.
Wear safety shoes for transport, installation and mounting work (see section
Mount the drinking water panel in a straight position (check, for example, with
a water level) to ensure that the liquids can drain off optimally.