3.2.2 Steps for installation
1.
Install the drinking water panel
(see section 3.2.3 M
2.
Connect any IQ S
ENSOR
N
ET
modules
(see section 3.2.4 C
).
3.
Prepare the turbidimeter for operation
(see section 3.2.5 P
4.
Connect the turbidimeter to the MIQ/IC2 module
5.
Supply the components with power
(see section 3.2.7 I
6.
Install the chlorine sensor into the D 19 flow through armature
(see section 3.2.8 I
7.
Install the sensor into the D 17 flow through armature
(see section 3.2.9 I
).
8.
Connect the sensors to the MIQ/IDS module
(see section 3.2.10 C
9.
Connection of the inlet and outlet
(see section 3.2.11 C
10.
Tidy up the cables
(see section 3.2.12 T
11.
Provide the sample flow
(see section 3.2.13 P
).
12.
Starting the measuring operation
(see section 3.3 S
).