Commissioning
Multi 3430
21
ba75865e19
04/2015
Make sure that only NiMH rechargeable batteries are in the battery
compartment. The charging process is optimized for NiMH re-
chargeable batteries. Other battery types can cause damage dur-
ing the charging process.
Make sure that the ambient temperature is max. 40 °C while the
power pack is connected.
During mains operation, one of the following symbols is displayed:
Note
Charge the batteries completely prior to putting the meter into operation
for the first time. The charging process takes approx. 10 hours. The
symbol is displayed if the batteries are nearly discharged.
3.3.3
Switching on the meter
Note
The meter has an energy saving feature to avoid unnecessary power
consumption during battery operation.
The energy saving feature switches off the meter during battery opera-
tion if no key is pressed during the adjusted interval. (How to set the
switch-off interval, see section 4.4).
The switch-off interval of the energy saving feature is not active when
the meter is supplied with power via the power pack or the USB-B
1
Connect the plug of the power pack to the socket for the power
pack on the Multi 3430.
2
Connect the original power pack to an easily accessible power
outlet.
:
Mains operation with charge function
Batteries are automatically charged in the background.
:
Mains operation
1
Press the
<On/Off>
key.
The meter performs a self-test.
The display shows the manufacturer's logo while the self-test
is being performed.
2
Connect the sensor.
The meter switches to the measuring mode (measured value
display).
Summary of Contents for WTW Multi 3430
Page 1: ...OPERATING MANUAL ba75865e19 04 2015 Multi 3430 DIGITAL METER FOR DIGITAL IDS SENSORS...
Page 6: ...Multi 3430 6 ba75865y19 04 2015 9 2 Firmware Update for IDS Sensors 132...
Page 14: ...Multi 3430 Overview 14 ba75865e19 04 2015...
Page 18: ...Multi 3430 Safety 18 ba75865e19 04 2015...
Page 124: ...Multi 3430 What to do if 124 ba75865e19 04 2015...
Page 133: ......