Commissioning
pHotoFlex
®
Turb
16
ba75976e07
09/2021
3.3
Initial commissioning
Perform the following activities:
For
– Battery operation: Insert the batteries (see section 3.2.2)
– Battery pack operation: Insert the battery pack (see section 5.1.2)
– Line power operation and charging the battery pack: Connect the
power pack (see section 3.2)
– Operation with LabStation and battery pack: Insert the battery pack,
connect the LabStation and insert the meter in the LabStation (see
LabStation operating manual)
Switch on the meter (see section 4.1)
Set the language as necessary (see section 4.3.3)
Set the date and time as necessary (see section 4.3.4)
When you set the language, date and time according to the men-
tioned sections of this operating manual you will quickly become
familiar with the simple operation of the
pHotoFlex
®
Turb
.