Turb 430 IR/T
Commissioning
15
ba75507d09
08/2021
3.4
Initial commissioning
Perform the following activities:
For
– Battery pack operation: Insert the battery pack (see section 5.1.2)
– Line power operation and charging the battery pack: Connect the
power pack (see section 3.2)
– operation with LabStation: connect the LabStation and place the
Turb 430 IR/T in the LabStation (see section 3.3)
Switch on the meter (see section 4.1)
Set the language as necessary (see section 4.4.3)
Set the date and time as necessary (see section 4.4.4)
When you set the language, date and time according to the men-
tioned sections of this operating manual you will quickly become
familiar with the simple operation of the Turb 430 IR/T.