Installation
Turb PLUS 2000
100193 Rev 0 ba77254e01 11/2020
15
Plumbing & Assembly
NOTICE
To avoid property damage or damage to the product, ONLY qualified personnel
should perform plumbing connections following all instructions, complying with
all local, state, federal and other governmental requirements, and with all building
and construction codes and standards.
Turb PLUS 2000 requires very little head pressure to operate 6.9kPa (1 PSI).
The flow-through cuvette is rated for a flow of 100ml/min. - 1 liter/min. (0.026-0.26Gal/min).
The integral pressure regulator is rated for a
MAXIMUM
pressure of 7 bar (101.5 PSI).
The
MAXIMUM
allowable fluid temperature is 50°C (122°F).
5.3.1
Initial Assembly
The IN and OUT tubes must be connected to the Turb PLUS 2000 before the system is
connected to the sample water source and drain.
1. Identify the IN tube. This is the tube with the white ratcheting clamp.
2. Install the IN tube between the sensor mounting earmarked IN and the flow head connection marked
IN. Secure both ends tightly.
3. Identify the OUT tube. This is the tube with the rotary backpressure valve.
4. Install the OUT tube between the sensor mounting earmarked OUT and the flow head connection
marked OUT. Secure both ends tightly.
5.3.2
Connection of Turb PLUS 2000 to System Plumbing
Requirements
•
Use ¼ inch OD flexible tubing (polyethylene or polypropylene) for connecting the Turb PLUS 2000.
NOTICE
If tubing may be exposed to sunlight, use opaque tubing to limit algae growth.
Turb PLUS 2000 has push-to-connect fittings for water inlet and drain connections.