System 182-XT-4
Installation
3 - 13
ba76027e02
12/2014
Fig. 3-6
Closing the enclosure (variant 1)
3.4.3
Variant 2: stack expansion backwards
Preparing the stack
mounting
Fig. 3-7
Preparing the MIQ modules for stack mounting (variant 2)
7
Attach the prepared DIQ/S 182-XT-4-PR to the cover of the
MIQ module. At the same time, ensure that the two clips on the
DIQ/S 182-XT-4-PR click into place in the lid of the
MIQ module. Subsequently, tighten the two screws (pos. 8 in
Fig. 3-4).
8
Close the cover of the DIQ/S 182-XT-4-PR and fix it in place
with the two countersunk bolts (pos. 7 in Fig. 3-6).
7
MIQ module
DIQ/S 182 XT-4-PR
5
1
2
For stack mounting remove label
and install contact carrier
4
3
MIQ module
DIQ/S 182 XT-4-PR
Summary of Contents for YSI 182-XT-4
Page 6: ...Contents System 182 XT 4 0 4 ba76027e02 12 2014...
Page 10: ...Overview System 182 XT 4 1 4 ba76027e02 12 2014...
Page 14: ...Safety System 182 XT 4 2 4 ba76027e02 12 2014...
Page 64: ...Installation System 182 XT 4 3 50 ba76027e02 12 2014...
Page 82: ...Operation System 182 XT 4 4 18 ba76027e02 12 2014...
Page 88: ...The SETTINGS menu System 182 XT 4 5 6 ba76027e02 12 2014...
Page 114: ...Relay outputs System 182 XT 4 6 26 ba76027e02 12 2014...
Page 116: ...Maintenance and cleaning System 182 XT 4 7 2 ba76027e02 12 2014...
Page 122: ...What to do if System 182 XT 4 8 6 ba76027e02 12 2014...
Page 134: ...Technical data System 182 XT 4 9 12 ba76027e02 12 2014...
Page 135: ...System 182 XT 4 1 ba76027e02 12 2014...
Page 138: ...Accessories and options System 182 XT 4 11 2 ba76027e02 12 2014...
Page 142: ...Appendix store separately if required System 182 XT 4 13 2 ba76027e02 12 2014...
Page 143: ......