Installation
System 182-XT-4
3 - 12
ba76027e02
12/2014
Premounting the ISO
blind nuts
Fig. 3-4
Premounting the ISO blind nuts (variant 1)
Stacking the
MIQ modules
Fig. 3-5
Stacking the MIQ modules (variant 1)
6
Insert the cheese-head screws (pos. 8 in Fig. 3-4) with the
plastic washers in the drilled mounting holes in the enclosure
and loosely screw in the ISO blind nuts (pos. 9).
9
8
DIQ/S 182 XT-4-PR
MIQ module
DIQ/S 182 XT-4-PR
Summary of Contents for YSI DIQ/S 182-XT-4-PR
Page 6: ...Contents System 182 XT 4 0 4 ba76027e02 12 2014...
Page 10: ...Overview System 182 XT 4 1 4 ba76027e02 12 2014...
Page 14: ...Safety System 182 XT 4 2 4 ba76027e02 12 2014...
Page 64: ...Installation System 182 XT 4 3 50 ba76027e02 12 2014...
Page 82: ...Operation System 182 XT 4 4 18 ba76027e02 12 2014...
Page 88: ...The SETTINGS menu System 182 XT 4 5 6 ba76027e02 12 2014...
Page 114: ...Relay outputs System 182 XT 4 6 26 ba76027e02 12 2014...
Page 116: ...Maintenance and cleaning System 182 XT 4 7 2 ba76027e02 12 2014...
Page 122: ...What to do if System 182 XT 4 8 6 ba76027e02 12 2014...
Page 134: ...Technical data System 182 XT 4 9 12 ba76027e02 12 2014...
Page 135: ...System 182 XT 4 1 ba76027e02 12 2014...
Page 138: ...Accessories and options System 182 XT 4 11 2 ba76027e02 12 2014...
Page 142: ...Appendix store separately if required System 182 XT 4 13 2 ba76027e02 12 2014...
Page 143: ......