Skystream Owner’s Manual
3-CMLT-1054 Rev O XCO 1191
Pg. 21
• Install nuts on bolts to secure Skystream to the tower.
• Connect the turbine ground wire as depicted in
Figure 2
. The turbine MUST be grounded to the tower
as shown.
• Torque the vibration isolator bolts to 60 lb-ft (80 N
·
m) in two steps. First torque all bolts to 40 lb-ft
(55 N
·
m) then tighten all bolts to 60 lb-ft (80 N
·
m).
• Mount the yaw shield halves using four M5 socket head screws. Refer to
Figure 10
.
Figure 8
Placing vibration isolators
Figure 9
Grounding turbine to tower