SPECIFICATIONS

Voltage requirement

:

110-120 or 200-240 VAC

Motor voltage

:

24 VAC

Rotation time

 (approx., @60Hz): Elevation (180°): 67 sec.

Azimuth (360°): 58 sec.

Maximum continuous operation

: 5 minutes

Rotation torque

:

Elevation: 14 kg-m (101 ft-lbs)
Azimuth: 6 kg-m (44 ft-lbs)

Braking torque

:

Elevation: 40 kg-m (289 ft-lbs)
Azimuth: 40 kg-m (289 ft-lbs)

Vertical load

:

200 kg (440 lbs)

Pointing accuracy

:

±4 percent

Wind surface area

:

1 m

2

Control cables

:

2 x 6 conductors - #20 AWG or larger

Mast diameter

:

38-63 mm (1-1/2 to 2-1/2 inches)

Boom diameter

:

32-43mm (1-1/4 to 1-5/8 inches)

Weight

:

Rotators: 9 kg (20 lbs)
Controller: 3 kg (6.6 lbs)

UNPACKING & INSPECTION

When unpacking the rotator confirm the pres-
ence of the following items:

Elevation Rotator Unit ................................. 1
Azimuth Rotator Unit .................................. 1
Controller Unit ............................................. 1
Mast Clamp (pair) ........................................ 2
Pipe clamp ................................................... 2
U Bracket ..................................................... 1
M8 x 16 Hex. Bolt ....................................... 4
M8 x 25 Hex. Bolt ....................................... 8
M8 x 70 Hex. Bolt ....................................... 4
M8 x 95 Hex. Socket Bolt ........................... 1
U-Bolt .......................................................... 2
6mm Spring Washer .................................... 4
6mm Flat Washer ......................................... 4
8mm Spring Washer .................................. 18
8mm Flat Washer ....................................... 12
M8 Square Nut............................................. 1
M8 Hex. Nut ................................................ 4
M6 Hex. Nut ................................................ 4
8-pin DIN Plug ............................................ 1
7-pin Metal Connector ................................. 2
Water Resist Cap ......................................... 2
Spare Fuse (117V:2A, 220V:1A) ................. 1
Instruction Manual ....................................... 1

If any of these items are missing or appear to
be damaged, save the carton and packing ma-
terial and notify the shipping company (or
dealer, if purchased directly at his shop).

Before proceeding with installation, confirm
that the AC voltage label on the rear of the
Controller matches your local line voltage: ei-
ther “117V” for 110 to 120 VAC, or “220” for
220 to 240 VAC.  If the labeled voltage range
does not match, return the controller to the
dealer from whom you purchased it (different
power transformers are installed for the differ-
ent voltage ranges).

Note that cable is not included with the rotator,
as the length must be determined case-by-case.
Contact your Yaesu dealer to obtain the length
of cable your installation requires.  For runs of
over 100 feet, use #18 AWG instead of #20
AWG.

Summary of Contents for G-5500DC

Page 1: ...Mexico Central So America 7270 NW 12th St Suite 320 Miami FL 33126 U S A YAESU EUROPE B V Snipweg 3 1118DN Schiphol The Netherlands YAESU UK LTD Unit 2 Maple Grove Business Centre Lawrence Rd Hounslo...

Page 2: ......

Page 3: ...l climatic conditions The rotators may be mounted together on a mast or independently with the azimuth rotator inside a tower and the elevation rotator on the must The controller unit is a handsomely...

Page 4: ...Bolt 4 M8 x 25 Hex Bolt 8 M8 x 70 Hex Bolt 4 M8 x 95 Hex Socket Bolt 1 U Bolt 2 6mm Spring Washer 4 6mm Flat Washer 4 8mm Spring Washer 18 8mm Flat Washer 12 M8 Square Nut 1 M8 Hex Nut 4 M6 Hex Nut 4...

Page 5: ...tch and confirm that the rotator slowly stops 6 Repeat step 5 pressing the DOWN switch instead of the UP switch The elevation rotator should turn in the opposite direc tion as the meter indication mov...

Page 6: ...ress the RIGHT switch again to continue clockwise rotation until the rotator reaches its end stop The indicator should now point to right edge 90 of the scale Elevation Indicator Press the UP switch t...

Page 7: ...om the computer routes through this grommet and is affixed in place by the nylon cable clamp Pin 6 1 4 2 5 3 7 8 Function Provides 2 to 4 5VDC corresponding to 0 to 450 Provides 2 to 4 5VDC correspond...

Page 8: ...cially during strong winds The azimuth rotator may be mounted at the top of the mast together with the elevation rotator or separately inside of a supporting tower The latter method is generally stron...

Page 9: ...nother flat washer and then a spring washer over the end of each stud bolt and start a nut on each to hold the hardware in place Installing the boom in the Elevation Rotator Do these steps for all ins...

Page 10: ...o that it indicates precisely 0 North Then using an accurate map and known landmarks position the antenna without using the controller so that it points to true North Alternatively consult a Geodetic...

Page 11: ...G 5500 Schematic Diagram...

Page 12: ...Copyright 1998 Yaesu Musen Co Ltd All rights reserved No portion of this manual may be reproduced without the permission of Yaesu Musen Co Ltd Printed in Japan E12901000...

Reviews: