background image

BRIEF

INFORMATION

RELATED WITH

INSTALLATION, INSTALLING AND OPERATING

1.

FIRST,

CHIMNEY DRAFT CONTROL MUST BE DONE

Draft of

the chimney must definitely be controlled before Central Heating Stove is used. Press a paper such

as

a

broadsheet to the chimney hole and if the papers stands still in that

position without falling or if the chimney

pulls the

paper towards the inside, it

means that draft of the chimney is good, Draft control of the chimney can

also

be done by burning a paper in the entry hole of the chimney. Chimney's draft affects the burning directly. If

the

draft of the chimney is weak, the heat you will get will not be enough and in this case, your fuel becomes

consumed unproductively.
A weak

chimney draft managing the stove is not enough for Central Heating Stove.

2.

WATER SYSTEM

_

You must do the connections

of boiler-pipe

with the type having the feature of mounting and

dismantling.

_

Apply

R1"

valve to hot water outlet

in

the models producing hot water and having instant water

heater serpentine

within the boiler.

Horizontal

pipe

going to the cores must not be smaller than R 3/4".

_

Pipes connected to boiler's air outlet must only be horizontal and upwards.

They must not be lowered and they must not be given's1 shape.

3.

WATER PUMPING TO THE SYSTEM

R

1"

pipe coming

from the network is connected to inlet line of the boiler. When filling the water, thermostat of

the pump must be adjusted to 'O' (Zero) degree in order to have the pump in operating state and the air taking
place

in the boiler can be thrown outside from top in a better

way. Must be filled as 1/3.

4. FUEL SELECTION

AND LOADING

For a good heat,

coal having 6000-7000 kcal/hour capacity and

with walnut-orange size must be preferred. Fuel

hopper must be filled as

2/3

at most.

Don't forget that if you load very little of fuel, you get little heat.

5. HOT UTILITY WATER

In models

having instant water heater within the central heating boiler, after having the boiler water reach 70°-

90°C,

hot utility water

can be obtained for a long period of time.

6.

HOW IS YOUR FURL COMBUSTION QUALITY

In a

good combustion; after ignition

and inflammation stage, flame becomes red or orange color.

Glowing coal becomes eye-popping brilliant.
In a

weak combustion; top surface of the coal is black during combustion and when the combustion ends

some

part of the coal remains unburned.

In a weak combustion, boiler's water and cores are not heated

sufficiently.

Besides, soot

accumulation

within a short period of time is the sign for bad chimney draft.

7. INFORMATION ABOUT THE DRAFT OF THE CHIMNEY

Chimney draft

is generated from the difference of the heat between the cold air of the outside and the hot air

inside

of the chimney. When the heat difference between the inside of the chimney and outer environment is big,

then chimneys have better draft during the cold weathers. Draft gets less during open air.

Very few elbows must be used between Central Heating Stove and the entry of the chimney and chimney's entry
must

be reached

within a short distance. This particularity is very important in order to obtain a good chimney draft.

Pipe must not get air from its joining parts.

Having the pipe get

the air from the side by entering the chimney

with a curve or entering the pipe to the chimney

more

than normal

reduces the draft.

If chimney pipes have bad heat insulation, exhaust gas becomes cold before it gets out. Draft becomes bad.

When you have cracks in your chimney, these

cause unnecessary air inlet within the chimney and not having the

plastering of the chimney bricks also reduces the draft.

Long

horizontal pipes must not be used, elevation must be

with angle and chimney smoke exit must be 1 meter

higher than the highest level of the roof.

Chimney draft decreases

when your chimney does not have adequate height and when

it becomes surrounded with

the roofs of the houses or trees

taking place in the surrounding.

Top

of the chimney

must

be covered

with the cap. This helps to have protection from the rain and southwest wind.

Chimneys must be cleaned once in every three months or once in a month.

Summary of Contents for 301

Page 1: ...OPERATING MANUAL Please do not use your Central Heating Stove before reading this manual with Fireplace Stoveand Solic Fuel cc MODEL NO English ...

Page 2: ...We thank you for choosing Yakar Products You will always obtain maximum output When you read this Operating Manual prepared to assist you and as long as you comply with the instructions in it ...

Page 3: ... THE LOCATION TO PLACE AND INSTALLATION INSTRUCTIONS 4 5 ELECTRICAL DIAGRAM 6 301 and 302 INSTALLATION CONNECTION DIAGRAM 7 OPERATING CENTRAL HEATING STOVE 8 WARNING and RECOMMENDATIONS 9 CHIMNEYS and POINTS TO TAKE INTO CONSIDERATION 10 PROBLEMS and SOLUTION PROPOSALS 11 12 POINTS TO TAKE INTO CONSIDERATION FOR THE GUARANTEE 13 ...

Page 4: ...rrounding RE FUELLING INTERVALS Burning Condition Fuel Type Re Fuelling Interval Nominal 6 000 kcal hour coal 5 hours Slow 6 000 kcal hour coal 12 hours EXHAUST GAS TEMPERATURE Exhaust Gas temperature is 200 C average Technical Specifications Product Code Capacity Fuel Type Smoke Pipe Diameter Boiler Inlet Outlet Pipe Fuel Capacity Electricity Pump Power Net Weight Width Depth Height 301 16 25 kW ...

Page 5: ... Rear Housing Lid 15 Riaht Housina Lid 14 Lef Housing Lid 13 Ashtray 12 Oven Glass 11 Cleaning the cover from the too 10 Lid Hamdle 9 Bottom Lid 8 Ceramic Glass 7 Middle Lid 6 Oven Lid 5 Pull And Dump Handle 4 Turninq Handle 3 Pull And Dump 2 Rotary 1 Bowl Grid Figure 1 ...

Page 6: ... with conic pipe couplings 2 12 Steam exit taking place on the expansion tank must be extended to restroom bathroom or to ventilation medium 2 13 Main line pipes of the installation must be R1 one finger Horizontal pipes for the final cores are selected as R 3 4 2 14 Very good heat insulation must be done for the pipes passing from the concrete floor Otherwise adequate heat can not be obtained fro...

Page 7: ...r Outlet 9 Water Flow Back To Boiler 10 Indicator Light 11 Thermometer thermostat 12 Water Level Indicator 13 herald steam dispose 14 steam outlet Make the installation of radiator heaters to structure with Conical Record so that the installation and dismantling would be easier During the installation we connect the water to boiler at 09 from the water line Expansion Boiler Figure 2 Installation c...

Page 8: ... be turned once with the screwdriver Big yellow screw is applied to its place when shaft starts to turn 3 6 Air of the cores must be removed Water level of expansion tank must be controlled 3 7 Water is given to the system from boiler s inlet pipe Figure 2 9 from service water line 3 8 After becoming sure that there is no leakage in the system fuel is loaded to the firing chamber and then the fire...

Page 9: ...te COKE Mix with Lignite with 1 3 rate WOOD Hu Hu Hu Hu Hu Hu Hu Hu 6650 7900 6500 7000 3200 4500 2500 3200 1100 2500 7000 7300 4500 5500 2000 3500 Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h a Good Draft b Average Draft c Bad DraftCeki CHIMNEYS and POINTS TO TAKE INTO CONSIDERATION Pipes of Central Heating Stove must be as short and they must be in vertical direction as much as possib...

Page 10: ...mmended one bracket FALSE RIGHT Figure 7 Expansion Connection Yanh Yanh Dogru Yanh Yanh Figure 6 Chimney Connection Expansion must be connected to boiler at least 1 degree incline s Figure 7 The roof ridge must be at least 80cm also smoke outlet should be through the window as well as If there is ash drawer it should be canceled Figure 8 Figure 8 Pipe and chimney connection ...

Page 11: ...ll and roof insulation must be done 4 This problem disappears after burning for a certain period of time and after the walls get warm LAST CORE IS NOT GETTING WARM 1 Horizontal pipe coming to the last core has been used as small R 1 2 2 Spout has occurred towards the inside at the source of plastic pipe and cross section of the pipe has been narrowed 1 Increase the revolution of the pump If not so...

Page 12: ...o either one of the seller dealer representative importer or manufacturer producer of the product when there is no service station If the malfunction of the product can not be eliminated within 30 Thirty days then the manufacturer producer or importer has the compulsion to allocate another product to the consumer by having similar characteristics until the repair of the products gets completed 4 I...

Page 13: ......

Page 14: ... the boiler water reach 70 90 C hot utility water can be obtained for a long period of time 6 HOW IS YOUR FURL COMBUSTION QUALITY In a good combustion after ignition and inflammation stage flame becomes red or orange color Glowing coal becomes eye popping brilliant In a weak combustion top surface of the coal is black during combustion and when the combustion ends some part of the coal remains unb...

Reviews: