7
Inspection and maintenance
07.2020
139
ba
-o
.2
.6
.0
-us
-3
.2
-ys
|
A1
18
67
50
1 Re
v A
E
Assemble the protective plate (8).
Tighten the clamping plates (9) with screws (10) and safety washers (for tightening
torques see table).
Type
Thread size
Tightening torque
[lb
f
ft
]
YKA/SKA
M6
7
M10
30
YKB/SKB
M10
37
YKC/SKC
M10
37
M12
64
YKE/SKE
M12
64
M16
155
7.19.5
Replacing the rope guide
The rope guide ring has 2 pre-drilled holes 10° and 30°.
Rope guide rings for other angles must be drilled according to the order.
Remove the rope guide (see section 7.19.3).
Screw bearing into the new rope guide ring at the same point.
–
Assemble on the half of the rope guide ring with the opening for the rope (30°) for
stationary wire rope hoist, underslung trolley (nBh) and double-rail crab.
–
Assemble on the half of the rope guide ring without opening for the rope (10°) for
underslung trolley (kBh).
Install the rope guide (see section 7.19.4).