4
Installation
07.2020
55
ba
-o
.2
.6
.0
-us
-3
.2
-ys
|
A1
18
67
50
1 Re
v A
E
Mounting holes on the lifting beam
Drum length L2
Drum length L3
Drum length L4
(3) Mounting holes
Reeving
Assembly position
2PS
1
4PS
2
Fasten the “
PL
S” (1) switching unit on at the prescribed position with the bolted
connections, see figures above.
Tighten the bolted connections with the prescribed tightening torque (12 Nm).
Perform a functional test, see the
Performing a functional test
section.