Drive-through mechanism conversion or replacement (single girder trolleys)
7.5.1
Drive-through mechanism for travel drive (trolleys KE-S33 - KE-S65)
Fig. 68
Depending on the flange width (B) of the runway beam and the length (L) of the drive-
through mechanism (1), install the drive-through mechanism in the installation position X3
or X4.
•
Install retaining rings (2).
•
See figure above and table.
Travel drive
Ø D
B
Drive-through mechanism
L
Installation location
X3
X4
L3 ±0.08
L4 ±0.08
[in]
[in]
[in]
[in]
[in]
SF17 1..
SF17 2..
3.1
3.9
3.5...5.7
15.4
3.8
-
5.7...7.7
-
1.8
7.7...9.8
19.5
3.8
-
9.9...12
-
1.8
12.1...13.8
23.4
3.8
-
13.8...15.7
-
1.8
15.8...17.7
27.4
3.8
-
17.8...19.7
-
1.8
SF17 2..
5.5
4.7...7.9
19.9
4.9
-
7.9...12.2
-
1.8
12.2...15.7
27.4
4.9
-
15.8...19.7
-
1.8
SF17 2..
7.9
4.9...8.7
20.1
see next page
8.7...15.7
29.1
15.8...19.7
30.7
Tab. 24
7.5.2
Underslung trolley UE-S4
Connecting pin and drive-through mechanism
•
Use connecting pin and drive-
through mechanism that fit beam area “B” (for
dimensions see Fig. 68 and Tab. 24).