3
All users must read these operating instructions
carefully prior to the initial operation. These instructions
are intended to acquaint the user with the hoist / trolley and
enable hime to use it to the full extent of its intended
The operating instructions contain important information
on how to handle the hoist / trolley in a safe, correct and
economic way. Acting in accordance with these instructions
helps to avoid dangers, reduce repair costs and downtime
and to increase the reliability and lifetime of the hoist / trolley
Anyone involved in doing any of the following work with the
hoist / trolley must read the operating instructions and act
• operation, including preparation, trouble shooting and
• maintenance, inspection, repair
Apart from the operating instructions and the accident
prevention act valid for the respective country and area where
the hoist / trolley is used, also the commonly accepted
regulations for safe and professional work must be adhered
Every unit leaving the factory is furnished with a test certificate
that shows the serial number of the hoist / trolley . This
certificate has to be filed together with the inspection
The continuous sound level at the place of work is equal to
73 dB. The measurements were taken at a distance of 1 m
from the hoist at 9 positions in accordance with DIN 45635,
2. OPERATING INSTRUCTIONS
2.1 Correct operation
• The Yale electric chain hoist model CPE is designed to lift
and lower loads up to the rated capacity. The lifting capacity
indicated on the hoist / trolley is the maximum safe working
load which must not be exceeded.
• Do not lift or transport loads
danger zone.
• Do not allow personnel to pass
Fig. 2)
• After lifting or tensioning, a load
must not be left unattended for
a longer period of time.
• Start moving the load only after
it has been attached correctly
and all personnel are clear of
• The operator must ensure that the hoist / trolley is attached
in a manner that does not expose himself or other
personnel to danger by the hoist, trolley , chain(s) or the
Inspection before initial operation
Inspection before starting work
Inspection of suspension and load hooks
Inspect the traverse (for trolleys)
Check adjustment of trolley width
3.1 Inspection before assembly
3.2 Electric chain hoist with hook suspension
3.3 Electric chain hoist with trolley
4. FUNTIONAL TEST AFTER ASSEMBLY
Installation, service, operation
6.2 Regular inspections, service and testing
Inspecting the load chain for wear
6.6 Electric chain hoist in general