background image

Essential Series

2

3

Essential Series

YDME - 50

YDME - 50

Installation
1. Hole Drilling

1.1 Draw the center lines 

1.3 Drill holes on the door faces 

1.3 Open the hole on the door edge  

1.2 Mark the positions of all holes 
      according to the template

Center line of
door thickness

Center line of
handle

Finished floor

Suggest 950mm

from the door

From  finished door, measure desired  height 
(950mm as recommended) on door.  Stretch it to a 
horizontal line cross 3 sides of the  door. Draw  
a vertical line on the  center of the door edge.

Tips:

 Mark the hole positions on the back of door in 

same way. The hole on the door edge is on the center 
of door edge.  

Tips:

 Drill halfway from each side

of the door. 
.  

Note: The part with colour       should be opened
only to a depth of 3mm. 

 

  

Reviews: