10
C/L
C/L
A
B
16
7/8
”
min
26”
4”
wood board
Installation –
Mounting the Range Hood
1. Select preferred ducting application (vertical or horizontal) and
prepare hood. Refer to page 11 for dual blower horizontal ducting.
2. Plum and mark center line.
3. Choose desired height above cooking surface
(26” min)
. Level and
mark line A (hood bottom).
4. Level and mark top of wood board line B,
1
6 7/8” from line A.
5. Mark center line of wood board. Center and align top of board with
line B. Secure wood board to studs using (4) M4 wood screws.
Wood
Board Dimensions
: (W x D x H)
RH70230AS - 27” x 1/2” x 4”
RH70236AS - 33” x 1/2” x 4”
RH70248AS - 45” x 1/2” x 4”
6. Prepare duct pipe and duct cut outs in upper cabinet or ceiling if
vertical ducting or prepare cut outs and ducting in wall If horizontally
ducting hood. Refer to hood specifi cations on page 8 for dimensions.
7. Prepare electrical wiring and electrical cut outs in upper cabinet or
ceiling if vertical ducting or prepare cut outs and electrical in wall if
horizontaly ducting.
8. Mount hood onto wood board and secure using (8) M4 wood screws.
9. Further secure hood onto wall through lower body screw holes by (2)
M4 wood screws.
10. Install electrical.
11. Install duct work and seal with certifi ed aluminum duct tape.
12. Power up hood and check for leaks around duct tape.
13. Install baffl e fi lters.
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
Summary of Contents for RH70230AS
Page 2: ......
Page 18: ...16 RH70230AS RH70236AS RH70248AS Wiring Diagrams ...