4
Installation
28
03.2018
ba
-o
.2
.6
.0
-us
-1.
1-
y
|
A
11
86
75
01
R
ev
A
A
Centering connection piece
1.
Loosen nuts (5) and shift connection piece (6) on connecting bolt (7) so that
dimensions
“z1”
and
“z2”
between trolley side cheeks (4) and connection piece (6)
are equal on both sides.
2.
Tighten nuts (5) with torque spanner to the specified tightening torques (see table
above).
Connecting bolt and drive shaft
Drive shaft
Ø D
B
L
Position
[in]
[in]
[in]
3.1
3.9
SF17 1..
SF17 2..
3.5 - 5.7
15.4
X3
-
5.7 - 7.7
-
X4
7.7 - 9.8
19.5
X3
-
9.9 - 12
-
X4
12.1 - 13.8 23.4
X3
-
13.8 - 15.7
-
X4
15.8 - 17.7 27.4
X3
-
17.8 - 19.7
-
X4
5.5
SF17 2..
4.7 - 7.9
19.9
X3
-
7.9 - 12.2
-
X4
12.2 - 15.7 27.4
X3
-
15.8 - 19.7
-
X4
7.9
SF17 2..
4.9 - 8.7
20.1 see next page
8.7 - 15.7
29.1
15.8 - 19.7 30.7
1.
Use connecting bolt and drive shaft suitable for beam range
“B”
.