4
Installation
50
03.2018
ba
-o
.2
.6
.0
-us
-1.
1-
y
|
A
11
86
75
01
R
ev
A
A
Rope anchorage (YKA/SKA
–
YKE/SKE)
1
Fig. 48
YKA/SKA
–
YKB/SKB
YKC/SKC
–
YKE/SKE
[mm]
[in]
[mm]
[in]
Xmax
6
0.24
15
0.59
A
50
1.97
50
1.97
B
100
3.94
100
3.94
1.
Observe information plate at rope anchorage.
2.
Insert end of rope into rope anchorage according to reeving
3.
Place rope around rope wedge (2) and pull it into the tapered rope recess (1) until the
loose end of the rope projects by approx.
3.9 in
.
4.
Secure loose end of rope with rope clamp (3) approx.
2
in
.
from the end of the rope
(see table below left for tightening torque).
5.
Max. projection of rope wedge:
YKA/SKA
–
YKB/SKB: Xmax = 0.24 in.
YKC/SKC
–
YKE/SKE: Xmax: = 0.59 in.
6.
Replace split pin (4) after dismantling it. Bend ends of split pin up.
WARNING
Falling parts hazard.
Ropes which are not secured as specified may lead to the rope
slipping and the load falling.
➢
Always insert the rope correctly into the rope anchorage and secure.
➢
Replace split pin every time it is dismantled.
Rope Ø
Metric
Tightening torque
[in]
[lb
f
ft
]
0.2-0.26
M6
4
0.28-0.31
M8
7
0.33-0.39
M8
15
0.47-0.49
M12
30
0.55-0.63
M14
70
0.79
M16
96
Tab. 20
Length L
YKA/
SKA
YKB/
SKB
YKC/
SKC
2PS
L2
L3
L4
12
12
-
12
12
-
12
12
-
4PS
L2
L3
L4
21
21
-
14
14
-
22
22
22
2PD
L2
L3
L4
17
17
-
18
18
-
17
17
17
Tab. 21
12
Fig. 49
14
Fig. 50
17
Fig. 51
18
Fig. 52
*1 Gear side