4
Installation
52
03.2018
ba
-o
.2
.6
.0
-us
-1.
1-
y
|
A
11
86
75
01
R
ev
A
A
Rope anchorage (YKE/SKE)
Length L
YKE/SKE
2PS
L2-L5
32
4PS
L2-L5
31
1PD
-
2PD
L2-L5
34
4PD
L3-L5
35
Tab. 27
Length L
YKE/SKE
2PS
L2-L5
32
4PS
L2-L5
31
2PD
L2-L5
34
Tab. 28
Length L
YKE/SKE
2PS
L2-L5
32
4PS
L2-L5
31
2PD
L2-L5
34
4PD
L3-L5
35
Tab. 29
31
Fig. 63
32
Fig. 64
34
Fig. 65
35
Fig. 66
*1 Gear side