EN_Installation manual_Memo_v2.9
- 7 -
1.
Install the ground cable on location
according to the applicable safety
regulations, in the center of where the
circular Memo playground is going
to be. Make sure the ground cable is
powered on a separate power group,
and has a minimum extra length of 1,5
m (±1.6yards) above the ground.
2.
Prepare the surface as described in the
costom made fundation document for your
location. Below an example of a curbstone
fininsh.
! Make sure the power connection is located
exactly in the middle of the circle !
5 Cable installation
230v assembled
on a separate
group, with at
least 1,5 m (1.6
yards) above
ground
Outside diameter curb stones: 8000mm (8.7 yards)
4.
4y
ar
ds
1.09yards