Chapter 7 Installation
6.
Attach the box to its support using the appropriate screw. (Diam. 4.0-4.5mm / head
7.5-8.0mm)
7.
Connect the other end of the cable to the power supply.
8.
Configure the settings. (Use the
(page 114)
Infrastructure
>
Stations
.)
7.4.3 Changing the positioning board and components
This document describes how to upgrade the positioning board and its components.
Before carrying out any of these procedures, you need to disconnect and open the charge
station.
1.
Disconnect the power from the charging station.
•
If the charging station is connected to the mains using a power cable, unplug the
cable.
•
If the station is connected directly to an electrical cabinet, first remove the station
cover (see below) and then remove the fuse inside the station.
2.
Remove the cover from the charging station. Undo the 4 (8mm) nuts connecting the
cover to the base.
3.
If the station is connected directly to an electrical cabinet, remove the fuse.
4.
Verify that all the LEDs indicate that there is no power connected.
Changing the beacon positioning board
As modifications are made to the beacon positioning board it may be necessary to replace it.
68 Turfmow 1000 Technician's Manual
Version: Release 3.5
Last updated: 2018-12-20