13
Operation
Operation
Before edging, make sure the area is soft enough so the blade
does not bog down. If necessary, water the area before edg-
ing.
Remove debris and other obstacles that could be thrown by
the rotating blade.
Plan your work so the blade is always on your right-hand side.
Begin each pass by positioning the unit over the work, and
with the engine running at about half-throttle. Slowly lower the
blade to the ground while applying full throttle.
Do not move the edger into the work so fast that the engine or
blade bogs down.
Regular and frequent use of the edger will make a neater lawn,
and a frequently trimmed edge will be easier to maintain.
CAUTION
Low-speed edging can lead to premature clutch failure.
WARNING
Wear eye protection, long pants, and boots when oper-
ating this machine.
Whenever you strike a hard object with the blade, al-
ways stop the edger and carefully inspect the blade for
damage. Never operate the edger with a damaged blade.
Summary of Contents for shindaiwa SBA-LE24
Page 2: ...2 ...
Page 21: ...19 X750 019 19 2 X750 288 270 2 2011 1Notes and rear cover MEMORANDUM ...
Page 83: ...3 ...