BRKT
7-37
61U5H11
Bracket unit
13. Connect the PTT motor leads to the bat-
tery terminals to fully retract the trim and
tilt rams, and then measure the hydraulic
pressure. If out of specification, overhaul
the PTT unit.
14. Reverse the PTT motor leads between
the battery terminals to fully extend the
trim and tilt rams.
15. Remove the special service tools, and
then install the manual valve and circlip.
NOTE:
Quickly install the manual valve before any
fluid flows out of the hole.
Sb
Lg
6G470260
Rams
PTT motor lead
Battery
terminal
Down
Light green (Lg)
+
Sky blue (Sb)
-
Hydraulic pressure (down):
6–9 MPa (60–90 kgf/cm
2
)
Lg
Sb
6G470270
Rams
PTT motor lead
Battery
terminal
Up
Sky blue (Sb)
+
Light green (Lg)
-
Manual valve:
3 N·m (0.3 kgf·m, 2.2 ft·lb)
61U5H11_07_1 06.2.13 1:24 PM Page 40
Summary of Contents for 115B
Page 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Page 4: ......
Page 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Page 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Page 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Page 255: ......